
Inspect the container
Check the container structure, walls, floor and doors for damage, distortion or points that could damage the flexitank.

OPERATIONS · FLEXITANK LOADING
A closer look at the key stages of flexitank installation, from container inspection to bulkhead and valve checks.
Flexitank loading brings together container inspection, interior protection, bag positioning and door-end securing. Each stage supports preparation for the onward movement of liquid chemicals.
Key stages arranged in order using photographs and operational material from the site.

Check the container structure, walls, floor and doors for damage, distortion or points that could damage the flexitank.

Remove debris and sharp protrusions, then install protective materials to reduce abrasion against the container.

Unfold the flexitank over the protective layer, smooth folds and check its position to avoid twisting, tension or local pressure.

Install and check the door-end bulkhead and supports, and confirm the valve is accessible for connection without being compressed.
Confirm suitability, loading conditions and destination arrangements against the cargo classification and the flexitank supplier’s and carrier’s requirements.
Share your cargo characteristics and route to discuss loading and transport arrangements.
Discuss your shipment ↗